Woo hoo!!!! The Superior Walls crew arrived at 9 a.m. today and by 3 p.m. the walls were in! The guys did a great job, everything is square and level. We've posted over 40 pictures on the web server (dated today, September 30) where you can check out the process. We also have a 40 minute video that shows highpoints of the installation. The video is stored on Yahoo Briefcase. (Will be available in a day or two) Be patient if you have a slow internet connection, the video is almost 30 MB in size. As soon as the crew left, Darko immediately installed filter drain fabric around the perimeter of the walls. If we get any soil erosion, the fabric will provide additional protection to the French drain under the gravel. The plumber should have all of the under gravel plumbing installed and ready for inspection by Sunday night (10/02).